Photos: Construction, January 16th 2002
Bigger image (31.5 KB)
|
Overview. 4 inch (10cm) insulation has been installed to the walls and 8 inch (20cm)
insulation has been installed in to the ceiling.
|
|
Bigger image (24.2 KB)
|
That hole on the screen wall will be closed soon. It's left open because some of my construction stuff is being
stored there. Notice the riser for the screen. It's 8 inch (20cm) high. |
|
Bigger image (29.6 KB)
|
Closer look to the screen riser. It's not quite finished yet. Some 2by4's needed...
|
|
Bigger image (27.8 KB)
|
Ceiling. Now that was a real sub-project! I had to install each and every one of those glasswool sheets separately,
using only ladders to get up there and almost each one of those sheets needed some trimming.
The lining of those 2by4's was not quite accurate. On the top of those sheets
are also 4 inch glasswool sheets crisscross and they needed to be cut to right diameter. |
|
Bigger image (19.7 KB)
|
Ceiling...
|
|
Bigger image (17.7 KB)
|
And that is how it looks on the top of that ceiling.
|
|
Bigger image (22.6 KB)
|
Seat risers.
|
|
Bigger image (19.8 KB)
|
View from the floor.
|
|
Bigger image (15.6 KB)
|
Some tools needed with that insulation project.
|
|
Bigger image (17.2 KB)
|
That's me.
|
|