Overview. Floor and screen wall boards are installed! Those boards are chip core boards,
22mm boards on the floor and 11mm boards on the wall. Boards are products of Puhos Board.
Maintenance hatch for cables between equipments. My projector, DVD and PS2 will be
installed into a table. Cables will be run in that sewer pipe which sticks out from the floor.
Location for amps, satellite receivers etc. Notice those sewer pipes, other one leads
to stage and the other one to maintenance hatch below seats. Diameter of those sewer pipes is 3 inch, should
be more than enough for wiring between equipments.